色老板在线精品免费视频

<optgroup id="bncdy"></optgroup>
<samp id="bncdy"><center id="bncdy"><xmp id="bncdy">
<ruby id="bncdy"><i id="bncdy"></i></ruby>

        <strong id="bncdy"></strong>
        <acronym id="bncdy"><sup id="bncdy"><nav id="bncdy"></nav></sup></acronym>

        Shenzhen Grande Electronic Linkedin Page
        Shenzhen Grande Electronic Co., Ltd logo
        E-mail us for a Quote:
        sales88@greattong.com
        Call us now:
        +86-755-83261869

        Home > Products


        Raspberry PI Full Turn-Key PCB Assembly-PCBA Partner China

        Time:2020-08-03 11:48:21 Click:

         

         

        Supplier: Shenzhen Grande Electronics
        Layers: 4
        Application: Raspberry PI  Full Turn-Key PCB Assembly-PCBA Partner China
        PCB:FR-4/1.6mm, 2oz finished copper
        Surface Treatment: HASL
        PCBA Lead time: 3-4 weeks
        Packing: Anti-static bag and compartmental packing
        Standard Warp: <0.75%


        [Description]
        1, Turnkey solution for Raspberry PI  Full Turn-Key PCB Assembly-PCBA Partner China.
        2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout.
        3, Electronic Contract Manufacturing.
        4, SMT&DIP&PTH&BGA.
        5, Components Sourcing.
        6, Quick PCBA prototype.
        7, X-ray test, the Internal Circuit Test (ICT) , Functional Test (FCT)
        8, Sample and small batch order are accepted.


        PCBA Service
        Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
        Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

        PCBA Quality Assurance
        1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
        2, 7 lines dust-proof SMT lines and DIP lines.
        3, All line works wear anti-static and dust-proof clothing.
        4, All operators should pass strictly training before they start work.
        5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
        6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
        7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
        8, Package Processed:
        0402, 0603, 0805, 1206, 1608, 2125, 3216
        Micro QFP 0.2mm
        Flip-chip, BGA, Connectors
        BGA Ball Pitch=0.2mm
        9, Each workstation in accordance with the SOP 
        10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
        11, Material Brand:KB, SHENGYI, NANYA and so on. 

        PCBA Lead Time
        PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
        Mass production: partial delivery according to the customer’s requirement.

        Other information for PCBA
        1, The mass production will be arranged after PCBA prototype confirmed. 
        2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
        3, EPE is used to avoid impact and crash.
        PCBA Standard Packing
        Anti-static bag and compartmental packing


        Previous:Biological Microscope ENIG 0.2mm Via PCB Prototype Manufacturing and Assembly

        Next:Breath Analyzer Multilayer Turnkey PCB Prototype Assembly | Grande | PCBA Fabric

         
        Home About Us Services Quality Pb-Free News Contact Us


        Copyright ® 2017,Shenzhen Grande Electronic Co., Ltd. All Rights Reserved. 中文站 Sitemap

        色老板在线精品免费视频

        <optgroup id="bncdy"></optgroup>
        <samp id="bncdy"><center id="bncdy"><xmp id="bncdy">
        <ruby id="bncdy"><i id="bncdy"></i></ruby>

            <strong id="bncdy"></strong>
            <acronym id="bncdy"><sup id="bncdy"><nav id="bncdy"></nav></sup></acronym>